User Tools

Site Tools


master_bath

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
master_bath [2025/05/28 20:17]
admin removed
— (current)
Line 1: Line 1:
-====== OVERVIEW ====== 
-The windows on the north wall will be removed and a double vanity will be installed there.  The windows on the east wall will be removed and replaced with a single window.  The tub will be removed and replaced with a tiled shower. 
- 
-The room will have a pocket door to maximize space. 
- 
-===== SHOWER ===== 
- 
-[[https://dreamlineshowers.com/french-linea-screen-shower-door.html|DreamLine French Linea Shower]] 
- 
-{{:bath_1.jpg?400|}} 
- 
-===== TOILET ===== 
- 
-===== VANITY ===== 
- 
-===== LIGHTS ===== 
- 
-===== MIRROR ===== 
- 
-===== FLOOR ===== 
- 
-{{:bath_floor.jpg?400|}} 
  
master_bath.1748477866.txt.gz ยท Last modified: 2025/05/28 20:17 by admin